current asset restrictions
(Planned)
Restrictions levied on transportation asset usage based on infrastructure design, surveys, tests, or analyses. This includes standard facility design height, width, and weight restrictions, special restrictions such as spring weight restrictions, and temporary facility restrictions that are imposed during maintenance and construction.
incident information
(Planned)
Notification of existence of incident and expected severity, location, time and nature of incident.
incident response status
(Planned)
Status of the current incident response including traffic management strategies implemented at the site (e.g., closures, diversions, traffic signal control overrides).
maint and constr resource request
(Planned)
Request for road maintenance and construction resources that can be used in the diversion of traffic (cones, portable signs), clearance of a road hazard, repair of ancillary damage, or any other incident response.
maint and constr resource response
(Planned)
Current status of maintenance and construction resources including availability and deployment status.
road network probe information
(Planned)
Aggregated route usage, travel times, environmental conditions, and other aggregated data collected from probe vehicles.
road weather information
(Planned)
Road conditions and weather information that are made available by road maintenance operations to other transportation system operators.
roadway maintenance status
(Planned)
Summary of maintenance fleet operations affecting the road network. This includes the status of winter maintenance (snow plow schedule and current status).
work plan feedback
(Planned)
Comments and suggested changes to proposed construction and maintenance work schedules and activities. This information influences work plan schedules so that they minimize impact to other system operations and the overall transportation system.